Our Jobs

Liettalietta 300x174 Our Jobs

Date: June – July 2017

Scope of work: Works performed in Rostock.
– total 3500 meters of cables were renewed (signal and power cables of boiler, incinerator, diesel generators, lamps)
– 1550 connections were done (400 bondings on cable trays and 1150 connections in prefabricated junction boxes.


BornholmBornholm 300x225 Our Jobs

Date: March 2017

Scope of work: TAMD165A – major overhauling of cargo compressor diesel engine after 1500 running hours,

works preformed in Port of Rostock during cargo operation.

 


 

Chiquita Ventur & Chiquita Progresschiquita venture 300x180 Our Jobs

Date: December 2016

Scope of work: Major overhauling of ME Wartsilla L46 and 3 gensets Wartsilla L20.


Karlygash
karlygash 300x188 Our Jobs

Date: November 2016

Scope of work: Rebuilding of Mitsubishi S16R-MPTA engine after serious damage. Work was performed on Caspian Sea.

 


 

MAFIMAFI e1458891714352 300x209 Our Jobs

Date: March 2016

Scope of work: Volvo Penta TAD 720 VE installed in diesel tractor MAFI on overhaul performed at our workshop in Swinoujscie. Cylinder liners and turbocharger exchanged after engine overheating

 

 


Somersetvolvopenta 300x168 Our Jobs

Date: January 2016

Scope of work: emergency service on Volvo Penta engine. 6 injectors were replaced on D16 engine on cement carrier SOMERSET.

Work was performed in port of Colombo / Sri Lank.

 


Green Concordiagreen concordia 300x245 Our Jobs

Date: May 2016

Scope of work: Ballast, fifi and bilge water pumps renewal by the tiling surface of pumps and impellers with BELZONA composities.